Data centers & mission-critical

Speed-to-power, protected.

Hyperscale and colocation. Bildstak federates your models, P6 programme, long-lead procurement, cost and commissioning — and an AI analyst flags what's putting the power-on date at risk.

0
open clashes
Cx 86%
verified
5 days
to power-on

Speed-to-power risk — activities flagged before they push the power-on date.

Long-lead procurement — gensets, switchgear and chillers against order-by dates.

MEP coordination — clashes caught before the congested plant room.

Capabilities

Built to protect the power-on date.

From long-lead procurement to MEP coordination, commissioning, and delivery risk — in one connected workspace.

01

Speed-to-power schedule risk

Cost- and resource-load the programme to the power-on date. The analyst flags activities trending late before they push speed-to-power for a whole hall.

02

Long-lead equipment procurement

Track generators, switchgear, chillers, and transformers against order-by dates back-calculated from the programme. See which long-lead items threaten the date.

03

MEP coordination & clash

Federate architectural, structural, and MEP models. Find clashes across disciplines before they hit a congested mechanical/electrical room on site.

04

Commissioning & handover

Track Cx levels and COBie handover deliverables against the asset and equipment list — what is verified, what is outstanding, what is missing before go-live.

05

Change & cost control

Cost-loaded schedule and EVM across base build, fit-out, and MEP. Change orders roll into earned value and cost variance as actuals flow in.

06

Delivery risk — the Analyst

An autonomous analyst investigates the whole build — schedule, procurement, coordination, commissioning, and documents — and ranks the risks with the evidence behind each.

Supported sources

Connects what you already use.

Primavera P6, IFC / BIM models, Procore, Aconex, SAP, Maconomy, Excel, CSV, and PDF document libraries. Thirty-plus source types, federated into one model. No middleware required.

Primavera P6IFC / BIMProcoreAconexSAPMaconomyExcelCSVPDF+ 30 source types

See it on your data center build.

Bring your programme, models, and procurement log. We'll run the demo on your real project data.

Frequently asked questions

How does Bildstak work for data-center construction?

Bildstak protects data-center construction timelines by tracking long-lead MEP equipment, MEP coordination issues, commissioning readiness and change and cost — all federated so the team can see exactly what stands between current status and the speed-to-power date. Read the full answer →

How does Bildstak protect a data center's speed-to-power date?

Bildstak protects a data center's speed-to-power date by federating long-lead equipment delivery schedules, MEP coordination issues, commissioning readiness records and cost data — and surfacing every threat to the energisation milestone with cited evidence, automatically ranked by impact. Read the full answer →

How does Bildstak do earned value management?

Bildstak delivers earned value management by loading your Primavera P6 schedule with cost data from your ERP (SAP, Maconomy or equivalent), then calculating CPI, SPI, EAC and variance at completion in real time — with every metric cited back to the source records. Read the full answer →

How do I score COBie handover readiness?

Bildstak scores COBie handover readiness by checking each asset in the model against the required COBie data fields — type, component, space, system, spare parts — and returning a completion percentage by asset category, cited element by element, so gaps are visible before the handover gate. Read the full answer →