Hyperscale and colocation. Bildstak federates your models, P6 programme, long-lead procurement, cost and commissioning — and an AI analyst flags what's putting the power-on date at risk.
Speed-to-power risk — activities flagged before they push the power-on date.
Long-lead procurement — gensets, switchgear and chillers against order-by dates.
MEP coordination — clashes caught before the congested plant room.
From long-lead procurement to MEP coordination, commissioning, and delivery risk — in one connected workspace.
Cost- and resource-load the programme to the power-on date. The analyst flags activities trending late before they push speed-to-power for a whole hall.
Track generators, switchgear, chillers, and transformers against order-by dates back-calculated from the programme. See which long-lead items threaten the date.
Federate architectural, structural, and MEP models. Find clashes across disciplines before they hit a congested mechanical/electrical room on site.
Track Cx levels and COBie handover deliverables against the asset and equipment list — what is verified, what is outstanding, what is missing before go-live.
Cost-loaded schedule and EVM across base build, fit-out, and MEP. Change orders roll into earned value and cost variance as actuals flow in.
An autonomous analyst investigates the whole build — schedule, procurement, coordination, commissioning, and documents — and ranks the risks with the evidence behind each.
Primavera P6, IFC / BIM models, Procore, Aconex, SAP, Maconomy, Excel, CSV, and PDF document libraries. Thirty-plus source types, federated into one model. No middleware required.
Bring your programme, models, and procurement log. We'll run the demo on your real project data.
Bildstak protects data-center construction timelines by tracking long-lead MEP equipment, MEP coordination issues, commissioning readiness and change and cost — all federated so the team can see exactly what stands between current status and the speed-to-power date. Read the full answer →
Bildstak protects a data center's speed-to-power date by federating long-lead equipment delivery schedules, MEP coordination issues, commissioning readiness records and cost data — and surfacing every threat to the energisation milestone with cited evidence, automatically ranked by impact. Read the full answer →
Bildstak delivers earned value management by loading your Primavera P6 schedule with cost data from your ERP (SAP, Maconomy or equivalent), then calculating CPI, SPI, EAC and variance at completion in real time — with every metric cited back to the source records. Read the full answer →
Bildstak scores COBie handover readiness by checking each asset in the model against the required COBie data fields — type, component, space, system, spare parts — and returning a completion percentage by asset category, cited element by element, so gaps are visible before the handover gate. Read the full answer →
Yes. Bildstak deploys in the cloud, in your own VPC, on-premise in your data centre, or fully air-gapped with no outbound connectivity — the same product across all four models. You choose the deployment that fits your security and data-residency requirements. Read the full answer →